Bullhead City SCADA System
- Date Completed: August 2014
- Project Location:
Bullhead, NV
- Project Category: Design assist/design build
Bombard Electric provided design-build services for a city-wide wastewater SCADA system consisting of 16 lift stations and two wastewater treatment plants. The SCADA system utilizes microwave antennas, remote terminal units and Wonder-ware Operation software.